2016 Pakistan Cement Limited Kalar Kahar

Project In Hand

Fabrication, Installation, Testing & Commissioning of 12 MW Waste Heat Recovery Power Plant.

Continue Reading...

2016 Fauji Cement Company Limited Jhang Bhatar

Project In Hand

Dismantelling, Fabrication & Erection of Mechanical, Electrical & Instrumentation Works.

Continue Reading...

2016 Pakistan Cement Limited Kalar Kahar

Project In Hand

Dismantelling, Fabrication and Erection of Coal Conveyer Belt, Hopper and its accessories.

Continue Reading...

2015 Frontier Paper Products Limited, Hattar:

Completed

Installation of Pre-Fabricated Steel Shed, Erection, Testing & Commissioning of Poly propylene sack Manufacturing

Continue Reading...

2015: ASKARI CEMENT LTD WAH

Project In Hand

BMR BUCKET ELEVATOR FOR RAW MEAL SILO SYSTEM DETAILS OF WORK : Local Fabrication(Buckets & Casing) Structure/Civil Work Installation of

Continue Reading...

2015: BESTWAY CEMENT LIMITED, HATTAR

Completed

7.5 MW WASTE HEAT RECOVERY POWER PLANT Detail of Work: -Process Piping involving Electric and Argon Welding -Fabrication of Ducts, Chutes, Casings

Continue Reading...

2015: BESTWAY CEMENT LIMITED, FAROOQIA

Completed

Electrical & Instrumentation Works of 6MW WHRPP at BCL Farooqia Installation, Earthing & Termination of Generator Installation, Termination, Testing

Continue Reading...

2015: DEWAN CEMENT LIMITED, KARACHI

COMPLETED

5 MW WASTE HEAT RECOVERY POWER PLANT Fabrication, Erection, Piping, Insulation, Commissioning & Testing of Waste Heat Recovery Power Plant.

2015: RAFHAN MAIZE PRODUCTS PLANT

COMPLETED

Erection, Commissioning & Trial Run of 12 MW, Coal Fired Power Plant at Rafhan Maize Products Plant, Jaranwala, Faisalabad. -Structural/Civil association

2015: PIONEER CEMENT LIMITED, CHENKI

Completed

Grate Cooler Upgradation on Line-2 at Pioneer Cement Limited, Chenki Jauharabad, Pakistan (Shutdown Work).

Continue Reading...

2014 ASKARI CEMENT LIMITED, PAKISTAN

Completed

Project: Dismantling & Installation of EP inlet Duct at Kiln-1 (Shutdown) Detail of work: Dismantling of worn out duct Installation of new duct

2014 FAUJI CEMENT COMPANY LIMITED

Completed

Excavation, Laying of Pipeline and Installation Pumps at FCCL site for Raw Water Supply of WHR Power Plant Project at JHANG BHATTAR Detail of work

2014: CHROME ORE SERVICES

Completed

Civil and Mechanical Works involved in installation of 150 T/Hr. Chrome Ore Crushing and Screening Plant at Fateh Jang Detail of Work: Design

Continue Reading...

2011-2012: IRON ORE COMPANY OF CANADA

Completed

Project: Geotechnical Remediation 2011 and water control. Detail of work Scaling, Installation of rock bolts and netting, Water control by drilling

Continue Reading...

2011: IRON ORE COMPANY OF CANADA

Completed

Project: Loading Pocket #2 overhaul Detail of work: RES, data collection, identity modifications or new installations, scoping, Abridged AFE

2012-2013 SAUDI ARAMCO

Completed

Wasit Gas & Saddara Projects, Saudi Arabia Fabrication, Installation & Commissioning of piping from 2” to 60” at Wasit Gas Project as a Sub Contract

Continue Reading...

2010 IRON ORE COMPANY OF CANADA

Completed

Project: Geotechnical Remediation 2010 and water control. Detail of work Scaling, Installation of rock bolts and netting, Water control by

2010 IRON ORE COMPANY OF CANADA (IOC)

Completed

Project: Loading Pocket #3 overhaul Detail of work: RES, data collection, identity modifications or new installations, scoping, Abridged AFE, design

2010: IRON ORE COMPANY OF CANADA

Completed

Project : Dust Collection System. Detail of work Cyclone based dust collection system: Involved in designing, procurement, preparation of

2009: IRON ORE COMPANY (IOC)

Completed

Project: Geotechnical Remediation Detail of Work: Scaling, Construction of gabion wall, Installation of rock bolts and application of rock

2009: IRON ORE COMPANY OF CANADA (IOC)

Completed

Project: Loading Pocket #2 overhaul. Detail of Work Replacement of pan feeder: Pans, chain, Idlers rollers, carrier rollers, bearing of rollers

2010 IRON ORE COMPANY OF CANADA (IOC)

Completed

Project: Loading Pocket #4 overhaul. Detail of Work: Replacement of pan feeder: Pans, chain, Idlers rollers, carrier rollers, bearing of rollers

2008: IRON ORE COMPANY OF CANADA (IOC)

Completed

Project: Emergency repairs of Pockets. Detail of Work: Repair, replacement and reinforcement of structural steel. Alignment of pan feeder

2008: IRON ORE COMPANY OF CANADA (IOC)

Completed

Project: Mechanical and electrical Over haul of Loading Pocket #2 and 3. Detail of Work: Replacement of pan feeder: Pans, chain, Idlers rollers, car

2008: IRON ORE COMPANY OF CANADA

Completed

Project: Dust suppression system on Belt Conveyors. Detail of Work: Installation of electrical and mechanical equipment and commissioning system.

2005-2006: ASKARI CEMENT LTD: WAH.

Completed

Up gradation project: Capacity enhanced from 3000 to 3500 tons per day (TPD) during a shutdown of 25 days. Installation and commissioning was complete

2005-2006: BESTWAY CEMENT LTD

Completed

Project: LVT Modification: up gradation of the project from 3900 TPD to 4300 TPD. This project involved 1000 M.ton dismantling of the equipment

2007-2012: IRON ORE COMPANY OF CANADA

Completed

Iron Ore Company of Canada (A company of Rio Tinto Group), Labrador Newfoundland and Labrador, Canada. Worked on capital and operational projects

Continue Reading...

2002-2003: KOHAT CEMENT COMPANY LTD PAKISTAN

Completed

Project: Complete Fabrication, Installation and commissioning of complete coal conveying and grinding plant. Details of wok

2002-2004: INSTALLATION OF LIME STONE CRUSHERS

Completed

These projects involve Engineering, Installation and Commissioning of Lime Stone Crusher, Belt conveyors, hoppers and chutes at different location

2003-2005: DANDOT CEMENT COMPANY LTD (DCCL)

Completed

Projects: Optimization of Rotary Kiln Annual maintenance shut down 2003 Annual maintenance shutdown 2004 Annual maintenance shut down

1998-2000: PARCO MID COUNTRY REFINERY PROJECT

Completed

Multan Detail of Work: Fabrication of heavy structural steel like columns, I beams, H Beams etc. Pipe Rack structure, trusses, stairs, platforms

1999-2000: PAKISTAN STATE OIL SARA-E-NAURANG

Completed

Design, supply, fabrication, Installation and Commissioning of piping Dismantling of the Oil tanks Burying of Oil tanks Civil Cons

2001-2004: ZAMAN CEMENT COMPANY Limited

Completed

Fabrication of Preheater columns Fabrication of Pre heater beams, purlins, crosses members, supports, and stairs and plate forms. Fabrication of

1996-1997: MAPLE LEAF CEMENT

Completed

(Expansion Project) at Iskandar Abad, Mianwali, Pakistan. Installation and Commissioning of Overland Belt Conveyor 3.5 KM Installation and Commi

1997-1998 ATTOCK REFINERY LTD

Completed

(Miscellaneous Projects) at Morgah Rawalpindi. Design, supply, fabrication and Installation of Piping associated with Fuel Oil tanks

1997-1998: ATTOCK REFINERY LTD

Completed

Up gradation Project (Crude and Reformer unit) Fabrication and Installation of heavy structural steel at Crude Unit like Columns, beams, joists

1995-1996: DHAN FIBER LTD

Completed

Installation and Commissioning of Power house (5x1.2 MW) at Industrial Estate Hattar IV Hattar, District Harri Pur PK. Pakistan. Detail of Work:

1995-1996: BASIC CHROMIUM SULPHATE (BCS)

Completed

Industrial Estate Hattar. Installation and commissioning of Rotary Kiln of the BCS. Installation of ducting, motors and pumps and commissioning